How do I process survey plan approval in Ogun?

Need help with Legal Matters?

Get free legal advice

Contact us to get the best legal advice for your legal matters today from the top lawyers in Nigeria

Table of Contents

How do I process survey plan approval in Ogun?
Facebook
Twitter
LinkedIn
WhatsApp

How do I process survey plan approval in Ogun?

Introduction

When dealing with land, real estate or construction projects in Ogun State, one of the most critical early steps is obtaining an approved survey plan. A survey plan delineates the precise boundaries, corners, topography, and layout of a parcel of land, and is a legally recognized document that the state’s land administration and planning authorities use for subsequent approvals (e.g. building plans, layouts, title registration). Without a properly approved survey plan, many downstream processes (such as applying for building permits, subdividing land, or transferring title) can be delayed, rejected, or rendered invalid.

In Ogun State, as in many Nigerian states, the process to get a survey plan approved involves multiple stakeholders, statutory fees, documentation, compliance with planning laws, and sometimes site inspections. Understanding exactly how to navigate this process—knowing which offices to visit, which documents to prepare, anticipated timelines, cost considerations, and common pitfalls—can save you weeks or months of delay.

In this article, we provide a comprehensive, step‑by‑step guide to processing a survey plan approval in Ogun State— from engagement of a surveyor to final approval and registration. We also highlight best practices, tips, potential bottlenecks, and how to integrate it into your overall development or title acquisition plans. At the end, you’ll find resources and a call to action to get started on your own survey plan approval confidently.

1. Overview: Why Survey Plan Approval Matters

Before diving into the mechanics, it’s useful to understand the rationale and importance of survey plan approval:

  • Legal recognition / evidence of boundaries: A survey plan (once approved) becomes a recognized document in the state’s records. It defines the exact boundaries, beacons, dimensions, and orientation of the land.

  • Required for building permits: Physical development (houses, shops, etc.) generally requires a building plan that references an approved survey. Without it, planning authorities may reject your building proposals.

  • Title registration / transactions: When applying for Certificate of Occupancy (C of O), Governor’s consent, or when transferring title, many land registries require a survey plan that has been certified or approved by the state’s Surveyor General or relevant agency.

  • Subdivision, layout, and infrastructure planning: For large tracts of land that will be subdivided or laid out with roads, drainage, etc., survey plans serve as the reference base upon which layouts are overlaid.

  • Dispute mitigation: An approved, officially recorded survey plan reduces boundary disputes with neighbors, as the state’s records can be consulted.

  • Compliance & enforcement: Planning authorities use survey plans to check that subsequent development remains within permissible setbacks, easements, and planning standards.

Because of all this, the survey plan approval is a foundational step in any land development or construction journey in Ogun State. Skipping or cutting corners here often leads to rework, rejection, or legal complications later.

2. Legal & Institutional Framework in Ogun State

Relevant Laws & Regulations

To understand the process, you should be familiar with some of the statutory frameworks governing land, surveying, and planning in Ogun State:

  • Urban & Regional Planning Law, Ogun State (e.g. Law No. 20 of 2005, as amended) — governs planning, layout approvals, physical development, and building control.

  • Surveyors Laws / Licensed Surveyors Act — regulating who can legally sign surveys and their professional conduct.

  • Physical Planning / Building Codes adopted by the Ogun State Ministry of Physical Planning / Urban Development.

  • State Land Use / Land Administration Laws — handling ownership, rights, consent, and title registration.

These laws empower the various agencies (Surveyor General’s office, Ministry of Physical Planning, Land Registry) to enforce standards, reject non‑compliant plans, and impose penalties or demolition for illegal works.

Key Agencies, Departments & Stakeholders

You’ll typically interact with multiple bodies in Ogun State. Here are the principal ones:

Agency / DepartmentRole in Survey Plan Approval / Land Development
Ogun State Ministry of Physical Planning & Urban Development (or equivalent)Oversees planning, layout approval, building control, permit issuance.
Ogun State Surveyor General’s Office / Survey DepartmentReceives, reviews, vets, approves survey plans; maintains record (cadastral) copies.
Land Registry / Directorate of Lands (State)Registration of title documents, verifying survey plans for title transfers and consent applications.
Local / Area Physical Planning OfficesZonal or local offices that may coordinate review or inspections.
Local Government / Town Planning / Urban Development Authority in the LGAIn some cases, local authorities assist or regulate planning within the locality.
Licensed / Registered Surveyors / ConsultantsThe professionals who execute the field survey, drafting, liaison, and submission.

It is important to know which specific departments or local offices your plot falls under (e.g. in Abeokuta, Sagamu, Ijebu Ode, etc.), as this affects where you submit, how long it takes, and which local bylaws may apply.

3. Prerequisites & Preliminary Considerations

Before you initiate the formal survey plan approval process, you must jump through certain prerequisite steps and make important choices.

1. Proof of Ownership / Title Documents

You must already have or be able to present evidence that you have legitimate rights to survey the land. Common documents include:

  • Certificate of Occupancy (C of O)

  • Deed of assignment / conveyance

  • Lease, sublease or deed certificate

  • Memorandum of understanding, sale agreement (though less ideal)

  • Evidence of payment of ground rent / annual dues

  • In some cases, prior survey documents (if available)

  • Payment of required stamp duties, consent, and registration fees

Without these, surveyors or the Review Office may reject your application from the outset.

2. Zoning, Land Use & Planning Constraints

  • Check with the physical planning department whether your land is in a zoned area (residential, commercial, industrial, agricultural) and any restrictions (setbacks, max height, coverage).

  • Confirm whether your intended use is allowed. Survey plans may be invalidated if subsequent developments violate zoning.

  • Identify any easements, rights of way, drainage lines, or utility corridors on the land that must be respected in your survey.

  • Check whether your location falls within any special planning zones (e.g. heritage areas, coastal zones, environmental protection zones).

3. Selecting a Licensed Surveyor

Your survey must be carried out by a licensed, registered surveyor. Key criteria:

  • Must be registered with the Nigerian Institution of Surveyors (NIS) and comply with professional ethics.

  • Must have experience in your locality (terrain, soil, landmarks).

  • Must be familiar with the Ogun State survey approval process and submission protocols.

  • Must commit to preparing submission‑ready plans (with minimum corrections).

  • The quotation should explicitly separate the mandatory government documentation / approval fees from the professional / field survey fees (so you don’t confuse them).

Warning: Some unscrupulous surveyors quote low fees by excluding or circumventing the required state documentation fees, then produce a “survey plan” that is not registered or approved. This is essentially a “pretense” document with no legal weight. Nairaland+1

So always insist on transparency and check that your surveyor will handle official submission to the Surveyor General’s office.

4. Step‑by‑Step Guide to Survey Plan Approval

Here is a detailed roadmap you can follow to guide your own process. Note that slight variation may exist depending on your local office, ward, or district.

Step 1: Engage a Licensed Surveyor

  • Enter into a written agreement / contract with the surveyor.

  • The contract should specify: scope of work, deliverables (field data, draft plan, final plan, submission), fees (surveyor fees vs government approval fees), timeline, and responsibilities.

  • Provide your title documents, site coordinates, and any existing plan copies (if available) to the surveyor.

Step 2: Site Field Survey & Data Gathering

  • The surveyor visits the land physically, establishes beacons/beacon numbering, measures boundaries, topography, contour, natural features, adjacency, and any encumbrances.

  • GPS, total stations, leveling instruments, and other survey tools are used for accuracy.

  • The surveyor will confirm existing boundary beacons, neighboring plot boundaries, and confirm coordinates.

  • Mark corners/beacons permanently as required (e.g. with concrete pillars).

  • Collect coordinates, angles, distances and other metadata to feed into the plan drafting.

Step 3: Drafting the Survey Plan

  • Using the field data, the surveyor produces a draft survey plan (blueprint) conforming to state standards (scale, orientation, dimensions).

  • The draft plan usually includes: boundary lines, beacon numbers, setbacks, topographic features, coordinates, north point, legend, and plot dimension tables.

  • It may also be contoured if topography is relevant.

  • The draft plan is submitted to you (the client) for preliminary review and corrections.

  • Once finalized, multiple copies are prepared (e.g. one “record copy” and several “blue copies” or “cadastral copies”).

Step 4: Submission to Ministry / Surveyor General Office

  • The surveyor (or you) formally submits the plan to the Ogun State Surveyor General’s Office (or designated Survey Department).

  • Usually, you submit two (2) or more copies (depending on state requirement) of the survey plan for costing and review.

  • The submission is accompanied by a payment advice / request for costing (prepared by the Surveyor General’s office).

  • The Office of the Surveyor General issues a Payment Advice / Invoice stating the government’s approval fee, revenue code, bank account to pay, etc.

Step 5: Payment of Mandated Fees

  • You make payment of the official approval / documentation fees per the payment advice into the designated Ogun State Government bank account.

  • After payment, you present the bank teller / receipt to the Survey Department.

  • The department issues an e‑receipt (or official revenue receipt) acknowledging the payment.

  • The e‑receipt is then returned to Survey Department or relevant review office as proof of payment.

Step 6: Review, Vetting & Corrections

  • The Surveyor General’s office (or designated review committee) examines your survey plan for compliance with technical standards, boundary correctness, beacon numbering, coordinate accuracy, labels, scale, layout, setbacks, and consistency with existing records.

  • The office may ask for corrections or clarifications.

  • You (or your surveyor) must respond promptly with updated plan or clarifications.

  • Once satisfied, the plan is recommended for approval up the chain (departmental heads, surveyor general, etc.).

Step 7: Final Approval & Registration

  • After all checks, the Surveyor General (or delegated officer) stamps / signs / endorses the approved survey plan.

  • A record/cadastral copy is retained by the state (for official archives).

  • The approved copies (blue copies, duplicate copies) are returned to you (applicant / surveyor).

  • In some cases, parts of the plan may be digitized and entered into a cadastral information system.

Step 8: Collection & Use of Approved Copies

  • You collect your approved copies from the Survey Department / Surveyor General’s office.

  • These approved copies then become the official baseline for further processes: building plan submission, layout subdivisions, change of use, title registration, etc.

  • Always keep a certified “State-approved copy” on your site for inspections and verifications by planning authorities.

5. Typical Timelines & Expected Delays

While ideal timelines depend on how busy the department is and the correctness of your submission, below is a rough guide:

StageIdeal Timeline*Typical Delay Risks
Submission & issuance of payment advice1–2 working daysBottleneck in admin, heavy submissions queue
Payment processing & e‑receipt issuanceSame day to next dayBank delays, mismatch of revenue codes
Review & vetting of plan3–7 daysTechnical discrepancies, heavy backlog
Corrections / resubmission1–3 daysDelayed response from applicant/surveyor
Final approval & stamping1–3 daysSignature delays, chain of approval
Collection of approved copiesSame day or nextDelays in printing, office logistics

* These are optimistic estimates and may stretch longer in practice due to staffing, bureaucratic lag, or technical objections.

It’s common for the entire process to take 2 to 4 weeks or more, especially if corrections are needed or if your plan is large or complex.

6. Cost / Fee Structure & How to Estimate

The cost of survey plan approval in Ogun State has two major components:

  1. Government / State Documentation Fees — These are non-negotiable fees charged by the state (Surveyor General’s office) for reviewing, approving, stamping, and registering the plan.

  2. Professional Surveyor Fees — The charges by the surveyor for fieldwork, drafting, submission liaison, corrections, and sometimes printing.

Government / Documentation Fees

While exact rates may vary over time, recent reports indicate that in Ogun State, the minimum cost for a registered survey of a plot of land was previously quoted at ₦150,000 (for general areas) as a baseline, though this may vary depending on zone (prime area, special prime area) and size. planetvilleestate.com+2ome.construction+2

For example, for a plot of 0–800 sqm:

  • In general area: ₦270,000

  • In prime area: ₦400,000

  • In special prime area: ₦1,050,000 ome.construction

These figures include the mandatory documentation / state fees but may also cover parts of the surveyor’s work, depending on how the surveyor quotes. Always request a breakdown.

Professional Surveyor Fees

These depend on:

  • Complexity of terrain (flat, hilly, forested)

  • Size of the land / number of boundary points

  • Access logistics (how remote or obstructed the site is)

  • Number of corrections and liaising needed

  • Printing, transport, and ancillary costs

A professional surveyor may quote 20–40% or more above the baseline documentation fees, depending on complexity.

How to Estimate / Negotiate

  • Ask multiple surveyors for quotes, each broken into “State documentation costs” and “Field/drafting costs.”

  • Check recent comparable projects in your area and local surveyor community rate norms.

  • Confirm that your quoted documentation fees align with what the state office will demand — don’t accept quotes that are suspiciously low (these may be schemes to produce “unapproved” plans).

  • Build a contingency (say 10–20%) into your budget for corrections, rework, or extra liaison.

  • Ensure that the surveyor’s quote includes handling the entire process up to collection of approved copies (or clearly specify what is not included).

7. Integration with Downstream Processes

Once your survey plan is approved, it becomes a key input into subsequent development and title processes. Here is how it ties in:

1. Building Plan Approval

  • To apply for a building permit, you must submit architectural, structural, mechanical, electrical drawings that reference your survey plan.

  • The planning office or building control authority will cross‑check that your proposed building footprint respects setbacks, easements, orientation, topography, etc.

  • They verify that your survey plan aligns with the building drawings.

  • Without an approved survey, your building plan application is likely to be rejected or deferred.

2. Title Registration, Governor’s Consent & Transfer

  • If you are acquiring title, applying for consent for assignment, or registering the property, the Land Registry often requires a certified survey plan from the Surveyor General as part of their package. Chaman Law Firm

  • The approved survey plan validates the plot dimensions and exact location before issuing or endorsing title documents.

3. Layout / Subdivision / Layout Approval

  • If you intend to subdivide the land into plots or lay out roads, drainage, open spaces, etc., your approved survey plan is used as the baseline.

  • Planning authorities may require you to overlay a layout on top of the approved survey plan, showing internal roads, allocation, easements, etc.

  • The layout approval process often demands that your survey plan has already been approved and recorded.

4. Compliance Monitoring & Inspections

  • During construction, planning or building control officers may visit your site and verify whether the physical boundaries and structure match your approved survey plan and building drawings.

  • Any deviations may lead to sanctions, withheld occupancy certificates, or forced modifications.

So, treat the survey plan approval not as a one-off but as part of a continuum. A strong, correctly approved survey plan reduces friction in all downstream steps.

8. Common Challenges & How to Mitigate Them

While the process is conceptually straightforward, many applicants run into obstacles. Below are common challenges and recommended mitigations:

ChallengeRoot CauseMitigation / Best Practice
Rejection due to technical errorsBeacon mislabeling, scale issues, coordinate mismatch, missing required elementsEngage a competent surveyor familiar with state standards; pre‑check your draft plan before submission.
Delays in approval / backlogOverloaded government office, understaffing, slow chain of signatoriesSubmit during less busy periods; follow up politely; plan for buffer time in your schedule.
Payment mismatches / revenue code errorsUsing wrong revenue code, paying into wrong accountCarefully follow payment advice instructions; confirm bank details with Survey Department.
Surveyor demands additional “hidden” feesPoor contract clarityEnsure your contract clearly separates state fees vs professional costs; insist on transparency.
Site access or obstruction issuesLandlocked plots, lack of road, dense vegetation, boundary disputesClear vegetation, coordinate with neighbors, secure access authorization before survey.
Conflicting existing survey recordsPast surveys differ, neighboring plans conflictResearch cadastral records, get neighbor’s plans, reconcile boundary discrepancies early.
Unapproved or “pseudo” survey plansUnlicensed surveyor or avoidance of state documentation feesAlways verify the licensed status of surveyor; insist on state-approved, stamped plan.
Loss or damage of beacon markingsBeacons being removed by others or vandalismUse durable materials, coordinate with neighbors, mark clearly, document with photos.
Limited local awareness / staff turnoverSome offices may not be fully updated on procedures, or staff changeGet official process documents from the state website, keep updated, and cultivate contacts.

By anticipating these, you can significantly smooth your path.

9. Best Practices & Tips from Professionals

Here are some practical tips to help ensure your survey plan approval goes smoothly:

  1. Start early: Don’t wait until the last minute. Begin the survey process as soon as you secure your land documentation.

  2. Pre‑verify requirements: Visit the Surveyor General’s office or planning department to get current checklists, submission requirements, and revenue codes.

  3. Use checklists: Maintain and crosscheck a submission checklist (documents, signatures, payment receipts) before handing in your plan.

  4. Maintain communication: Ask your surveyor or consultant to follow up regularly with the review office to track progress and flag issues early.

  5. Document everything: Keep copies (digital & physical) of submissions, receipts, official correspondences, and meeting minutes.

  6. Site photographs and logs: When your surveyor visits the site, take photographs and record time/date, as these may help in later verification or dispute.

  7. Mark beacon numbers clearly: So that reviewers can correlate site beacons to plan.

  8. Be responsive to corrections: Where the review office requests modifications, respond quickly and avoid repeated rounds.

  9. Keep extra sets: After approval, print extra certified copies for building authorities, title offices, and your records.

  10. Follow up post‑approval: Ensure your plan is properly indexed in the cadastral archive, and ask for confirmation or reference number.

  11. Stay updated: State policies, fees, or process flows can change—visit the Ogun State e‑planning portal or Ministry websites to get current information.

  12. Engage local consultants: Local survey and planning consultants familiar with your specific LGA (e.g. Abeokuta, Ijebu, Ota) often know the quirks and preferences of local review officers, helping you avoid avoidable delays.

10. Sample Checklist / Template

Below is a sample checklist you might use when preparing your survey plan submission.

Survey Plan Approval Submission Checklist (Ogun State)

ItemStatus (✔) / Notes
Title / Ownership Documents (C of O, deed, assignment)
Proof of payment of land rent, ground rent, etc.
Engagement letter / contract with licensed surveyor
Draft survey plan (preliminary) for review
Beacon / boundary marking carried out on site
Final survey plan copies (blue prints, duplicates)
Payment advice / invoice from survey office
Bank teller / payment receipt
E‑receipt from state revenue office
Site photographs and logbook (beacons, markers)
Signed cover letter addressed to Surveyor General / Ministry
Submission record / acknowledgment slip from office
Contact information (phone, email) of applicant / surveyor
Space for reviewer comments / corrections
Approved stamped copy collection details

You can embed this checklist in your WordPress article as a user resource or downloadable PDF.

11. Case Studies & Illustrative Scenarios

To bring the process to life, here are two hypothetical case studies illustrating how survey plan approval plays out in practice.

Case Study A: Single Residential Plot in General Area

Background: Mr. A owns a plot in a suburban (non-prime) area of Ogun. He wants to build a small bungalow.

Steps:

  1. He engages a licensed local surveyor, gives title documents and site coordinates.

  2. Surveyor visits the land, marks boundaries, collects data.

  3. Draft plan is created and shared with Mr. A for review.

  4. Two copies are submitted to Surveyor General’s office; payment advice is issued.

  5. Mr. A pays required state documentation fee (e.g. ₦150,000), gets e‑receipt, returns to office.

  6. Reviewers examine the plan; one minor correction is requested (beacon label adjustment).

  7. Surveyor corrects and resubmits.

  8. Plan is approved, stamped, and returned within ~7 working days.

  9. Mr. A collects the approved copy and proceeds to building plan application.

Because it was a simple site in a less busy office and everything was in order, the whole process took about 10 business days.

Case Study B: Large Tract Subdivision in Prime Area

Background: Company B acquired 5 hectares in a prime corridor and plans to subdivide into multiple plots, roads, drainage, open spaces.

Steps:

  1. They engage a top survey and planning firm with experience in Ogun.

  2. Survey is done over multiple days, beacons numbered, topography mapped.

  3. Draft plan is prepared and discussed with Ogun planning authorities for conformity to corridors, setbacks, road layout.

  4. Multiple copies submitted. Payment advice is high due to prime area zone (e.g. ₦400,000 or more).

  5. After payment, reviewers perform detailed vetting including overlay checks, consistency with planning rules, adjacency verification.

  6. Multiple rounds of corrections are required (some boundary adjustments, labeling, coordinate consistency).

  7. After about 3 weeks, final approval is given.

  8. Approved plan is used as the base to overlay layout (roads, utility corridors).

  9. The project proceeds to layout approval and building permit stages.

Because of the scale and complexity, the process might take 4–6 weeks or more, factoring in multiple corrections and scheduling.

12. Frequently Asked Questions (FAQs)

Q1: Can I use an old/previous survey plan instead of a new one?

  • Only if it is still valid, properly certified, and accepted by the Surveyor General’s office. Many old plans may be outdated, lacking proper beacon numbering, or non-compliant with new standards. It’s safer to commission a fresh one.

Q2: What happens if my survey plan is rejected?

  • You’ll receive a list of objections or required corrections. You (or your surveyor) must revise and resubmit addressing exactly the reviewer’s points. Repeated rejections may have associated delay fees.

Q3: Can I expedite the process?

  • In some cases, if you pay additional facilitation or prioritize during off-peak periods, or use a surveyor known to the staff, it may speed up. However, official processes must be followed; shortcuts risk rejection.

Q4: What if the land is inaccessible or heavily vegetated?

  • Clear access paths, coordinate with neighbors, or seek local assistants. The terrain may increase surveyor fees or require more sophisticated equipment.

Q5: Can I begin construction before survey approval?

  • This is risky and generally not advised. Planning authorities may refuse to sanction or may penalize you. Always obtain survey approval before commencement.

Q6: Does approval guarantee title or land ownership?

  • No. Survey approval only validates the layout and boundaries. Title (C of O, consent etc.) is a separate process handled by land registry and the state government.

Q7: Who retains the “record copy” of my survey plan?

  • The State (Survey Department or Surveyor General’s office) retains a certified record/cadastral (or “record copy”) for archival and reference. You receive certified working copies.

Q8: Will my survey plan be digitized / entered into a GIS system?

  • In many states, yes, as cadastral systems are modernized. Ogun State’s planning / survey authority may increasingly adopt digital platforms. Always ask whether digital submission is accepted or required.

13. Conclusion & Call to Action

Obtaining an approved survey plan in Ogun State is a foundational, non-negotiable step in any land development or construction journey. While the process involves multiple steps, stakeholders, approvals, and fees, careful preparation, engagement of competent professionals, and adherence to state requirements can make it manageable.

To recap, here is a simplified summary:

  1. Confirm land ownership and zoning rights

  2. Hire a qualified, licensed surveyor

  3. Perform the field survey, draft plan, mark beacons

  4. Submit to Surveyor General’s office with appropriate copies

  5. Pay the mandated documentation fees

  6. Respond promptly to corrections

  7. Get final approval, stamps, and certified copies

  8. Use approved plan for building permits, title registration, or layout processes