Best Legal Structures for Joint Venture Projects in Lekki?
Introduction
Lekki, Lagos, has evolved into one of Nigeria’s most desirable and rapidly developing real-estate corridors. Stretching from Victoria Island through Lekki Phase 1 to Ibeju-Lekki, it hosts luxury estates, commercial complexes, industrial parks, and residential communities attracting both local and international investors. With skyrocketing land values and limited availability of prime plots, joint-venture (JV) developments have become a popular and strategic model for property owners and developers alike.
In a typical Lekki joint-venture project, a landowner contributes land while a developer contributes capital, expertise, or construction resources. The parties share the profits, units, or developed portions according to an agreed ratio. However, while this arrangement sounds simple, the success—or failure—of the venture depends almost entirely on choosing the right legal structure and formal documentation.
This article provides a comprehensive analysis of the best legal structures for joint-venture developments in Lekki, exploring options under Nigerian law, tax considerations, profit-sharing mechanisms, documentation, and case law. It also includes a practical case study and an FAQ section to guide investors, developers, and landowners.
Understanding Joint-Venture Developments in Lekki
A joint-venture development refers to a legally recognized business arrangement in which two or more parties pool resources—land, capital, expertise, labour, or materials—to execute a real-estate development project, sharing profits and risks.
In the context of Lekki’s real-estate ecosystem, joint-ventures often arise in these scenarios:
A landowner with valuable land lacks funds to develop it.
A developer or investor wants access to strategically located land but does not want to buy outright.
Both parties agree to collaborate, develop, and share the returns.
The result is a mutually beneficial partnership that allows the landowner to monetize land holdings and the developer to expand portfolio without massive capital outlay.
Why Legal Structure Matters
In Lekki, where land disputes and defective titles abound, the legal structure determines:
Ownership and control of the project.
Responsibility for funding and construction.
Risk allocation and liability.
Tax implications.
Dispute-resolution pathways.
Regulatory compliance.
Without a sound legal structure, JV parties risk future litigation, revenue losses, or government sanctions. A poorly structured JV can even lead to forfeiture of the property where title is defective or the development violates planning regulations under the Lagos State Physical Planning and Development Authority (LASPPDA).
Common Legal Structures for Joint-Venture Developments in Nigeria
Several legal frameworks can govern a Lekki joint-venture. The best choice depends on the parties’ objectives, financial arrangements, and risk appetite. The primary options include:
Contractual Joint-Venture (CJV)
Equity or Corporate Joint-Venture (EJV)
Special Purpose Vehicle (SPV)
Partnership (Limited or General)
Trust or Nominee Structure
Co-development or Co-ownership Agreement
Each structure has distinct implications, which we explore in detail.
Contractual Joint-Venture (CJV)
A contractual joint-venture is the most common model for property development in Lekki. It is based on a comprehensive Joint-Venture Agreement (JVA) that defines rights, duties, obligations, and profit-sharing arrangements.
Key Features
No separate legal entity is created.
The JVA governs all aspects of the project.
Ownership of the land remains with the landowner until transfer or allocation.
The developer is usually granted a Power of Attorney to enter, construct, and sell agreed units.
Advantages
Simplicity and low setup cost.
Flexibility in drafting terms.
Easy to terminate or modify.
Each party retains its existing corporate structure.
Disadvantages
Higher personal liability exposure.
Possible tax complications since profits are taxed at individual or company level separately.
Enforceability relies heavily on precise drafting of the JVA.
A well-drafted JVA should clearly address:
Description of the property and verification of title.
Contribution of each party (land, finance, permits).
Profit or unit-sharing ratio (e.g., 60:40 or 70:30).
Duration and completion timeline.
Power of Attorney and developer’s rights.
Termination clauses.
Dispute-resolution mechanism (preferably arbitration or mediation).
Equity or Corporate Joint-Venture (EJV)
In this structure, both the landowner and developer form a new corporate entity, often a limited-liability company registered under the Companies and Allied Matters Act (CAMA 2020). The company becomes the vehicle for the project.
Key Features
Both parties hold shares proportionate to their contributions.
The company owns the project’s assets and liabilities.
Corporate governance applies—directors, board meetings, audited accounts.
Advantages
Separate legal personality limits liability.
Easier access to bank loans and investors.
Clear shareholding and profit distribution via dividends.
Continuous existence beyond project completion.
Disadvantages
More complex to manage.
Requires registration with CAC, tax filings, and annual returns.
Potential double taxation—company profits and dividends.
This structure is ideal for large-scale Lekki projects such as luxury estates, shopping complexes, or mixed-use developments involving multiple investors.
Special Purpose Vehicle (SPV)
A Special Purpose Vehicle (also called Project Company) is a separate company formed exclusively to undertake a particular development project.
Advantages
Ring-fences project risk—creditors cannot pursue the parent entities.
Facilitates financing and investor participation.
Transparent accounting for a single project.
Typical Setup in Lekki
A landowner contributes land to the SPV as equity, while the developer injects capital and expertise. The SPV then secures building approvals, executes the project, and distributes profits according to shareholding ratios.
This is especially preferred for multi-billion-naira estates such as Orchid Road developments, Pinnock Estate extensions, or Ibeju-Lekki industrial projects where banks or private-equity funds participate.
Partnership Structure
Partnerships (governed by Part B CAMA 2020 or the Partnership Law of Lagos State 2009) may be general or limited.
In a general partnership, all partners share profits and are personally liable for debts.
In a limited partnership, at least one partner’s liability is limited to the amount invested.
Although partnerships offer flexibility, they are rarely used for large Lekki property developments because of liability exposure and limited fundraising ability. However, they may work for smaller residential duplex projects among family members or close associates.
Trust or Nominee Arrangement
Sometimes, a landowner sets up a trust in which the trustee holds legal title for the benefit of both parties. Alternatively, a nominee arrangement may be used where one party (often the developer) temporarily holds title pending completion.
This structure safeguards beneficial interests and is often combined with an SPV or JVA to secure financing or protect family inheritance.
Co-Development or Co-Ownership Agreement
Under this structure, both parties co-own the property or development site and execute a Co-Development Agreement outlining construction responsibilities and allocation of completed units.
It works best where the land is subdivided into plots or blocks of flats, and each party develops or sells specific sections.
Comparative Analysis of Structures
| Structure | Separate Legal Entity | Risk Exposure | Ideal Project Type | Ease of Financing | Administrative Cost |
|---|---|---|---|---|---|
| Contractual JV | No | High | Small/medium projects | Moderate | Low |
| Corporate JV | Yes | Low | Large mixed-use estates | High | Moderate |
| SPV | Yes | Very Low | Large estates, industrial parks | Very High | Moderate |
| Partnership | No | High | Small private developments | Low | Low |
| Trust/Nominee | No | Moderate | Family or inheritance-based | Moderate | Moderate |
| Co-development | No | Moderate | Flat/duplex sharing | Moderate | Low |
Regulatory and Statutory Considerations in Lekki
1. Title Verification
Before entering any JV, the developer must conduct a full title search at the Lagos State Land Registry, Alausa. Common titles include:
Certificate of Occupancy (C of O).
Governor’s Consent.
Deed of Assignment.
Excision or Gazette.
Failure to verify title may invalidate the JV or expose the developer to litigation under the Land Use Act 1978.
2. Planning and Building Approvals
The Lagos State Physical Planning Permit Authority (LASPPPA) and Building Control Agency (LASBCA) regulate development. The JV structure must enable the party responsible for construction to apply for:
Layout approval.
Building plan approval.
Stage certification.
Occupancy certificate after completion.
3. Taxation
Tax obligations differ across structures:
CJVs: Each party pays tax separately.
Corporate JVs/SPVs: Company pays corporate tax; dividends taxed on distribution.
Partnerships: Partners taxed individually.
Stamp Duties, VAT on construction services, and Capital Gains Tax on disposal must also be considered.
4. Dispute-Resolution Clauses
A robust JV agreement should mandate Arbitration or Mediation in Lagos (often under the Lagos Court of Arbitration or LACIAC) before litigation. This protects relationships and ensures confidentiality.
Drafting the Perfect Joint-Venture Agreement for a Lekki Project
A well-structured Joint-Venture Agreement is the backbone of every development partnership. Key clauses include:
Recitals – identifying the parties and objectives.
Contributions – land, capital, expertise, or permits.
Development obligations – project timeline and standards.
Profit/Unit Sharing Ratio – typically 60:40, 70:30, or 50:50.
Transfer of Interest – restrictions on assignment or sale.
Power of Attorney – to enable developer operations.
Force Majeure – to cover unforeseen events.
Termination and Exit Options.
Governing Law and Jurisdiction – Lagos State.
Case Study: Successful JV Development in Lekki
Case Title: Ocean View Residences Ltd v. Blue Haven Developers (2021) – Unreported Commercial Arbitration, Lagos.
Background:
A landowner in Lekki Phase 1 contributed 2,500 sqm of land valued at ₦500 million, while the developer committed ₦800 million for construction of 10 luxury apartments. The parties executed a Joint-Venture Agreement (60:40) and created an SPV – Ocean View Residences Ltd.
Dispute:
After completion, the developer attempted to sell extra units outside the agreed allocation. The landowner filed for arbitration claiming breach of the JVA.
Decision:
The arbitral panel ruled that the SPV was a separate legal entity, but the developer’s conduct breached fiduciary duty. The panel awarded the landowner compensation equivalent to two apartment units.
Lesson:
Even when an SPV exists, proper board control, audited accounts, and transparent sale procedures are crucial.
Risk-Mitigation Strategies
Conduct Due Diligence: Verify titles, planning approvals, and reputations.
Register the JVA or Deed of Assignment: To ensure enforceability under the Land Instruments Registration Law.
Obtain Governor’s Consent: Where property interest is transferred.
Insure the Project: Construction, fire, and liability insurance.
Adopt Clear Accounting Systems: Use escrow or project accounts.
Engage Professional Advisors: Lawyers, valuers, quantity surveyors, and accountants.
Emerging Trends in Lekki Joint-Venture Models
Hybrid SPVs combining local and foreign capital.
Diaspora participation through real-estate investment clubs.
Digital land registries enhancing title transparency.
Green-building partnerships emphasizing environmental sustainability.
Crowdfunded developments using fintech platforms registered with the SEC.
These innovations demand even more robust legal frameworks to safeguard all stakeholders.
The Role of Lawyers in Structuring JV Developments
Legal practitioners play indispensable roles in:
Drafting and negotiating JVAs.
Conducting due diligence and title verification.
Registering SPVs and obtaining permits.
Structuring tax-efficient arrangements.
Managing dispute-resolution processes.
Firms such as Chaman Law Firm, Lekki – Lagos, have extensive experience in advising developers, landowners, and investors on these transactions, ensuring compliance with Lagos laws and protecting client interests.
Case Law References
A-G Lagos v. Eko Hotels Ltd (2006) 18 NWLR (Part 1011) 378 – on Governor’s Consent and land-use compliance.
Union Bank v. Ajabule (2011) 18 NWLR (Part 1278) 152 – on contractual obligations.
Olowu v. Olowu (1985) 3 NWLR (Part 13) 372 – on family land and consent.
Longe v. FBN Plc (2010) 6 NWLR (Part 1189) 1 – corporate governance in company law.
Practical Steps to Establish a Joint-Venture Development in Lekki
Identify the Land and Verify Title.
Conduct Feasibility and Valuation Studies.
Negotiate Terms and Ratios.
Engage Legal and Technical Experts.
Draft and Execute JVA/Shareholders’ Agreement.
Register SPV or File JVA at Land Registry.
Obtain Development Permits and Approvals.
Implement Construction and Marketing Plan.
Maintain Accounting and Reporting Standards.
Distribute Units or Profits According to Agreement.
Frequently Asked Questions (FAQ)
Q1: What is the most common JV structure used in Lekki?
The contractual joint-venture governed by a Joint-Venture Agreement remains the most common, especially for medium-scale residential projects.
Q2: Can foreign investors participate in Lekki JVs?
Yes. Foreign investors may participate through an SPV registered with the Nigerian Investment Promotion Commission (NIPC) and Corporate Affairs Commission (CAC), provided compliance with the Foreign Exchange (Monitoring and Miscellaneous Provisions) Act.
Q3: Who should hold the title during development?
Usually, the landowner retains title until the developer fulfills agreed obligations, but a Power of Attorney or Deed of Assignment in escrow is executed to protect the developer’s interest.
Q4: Is Governor’s Consent mandatory for JV agreements?
Yes, where any transfer or assignment of interest in land occurs. Under Section 22 of the Land Use Act, Governor’s Consent must be obtained; otherwise, the transfer is void.
Q5: How are profits shared?
Profit or unit sharing follows the ratio stated in the JVA—often 60:40 or 70:30—after deducting expenses, taxes, and agreed costs.
Q6: Can JV disputes be settled out of court?
Absolutely. Arbitration or mediation is encouraged under Nigerian law and offers faster, confidential resolution compared to litigation.
Q7: What happens if one party defaults?
The JVA should contain default clauses allowing termination, damages, or repossession of property. Developers often issue post-dated guarantees or performance bonds.
Q8: How are taxes handled?
Each entity is taxed according to structure—corporate income tax for companies, personal income tax for individuals, VAT on services, and stamp duties on instruments.
Q9: What is the lifespan of a JV project?
Most Lekki residential JVs last between 24 – 48 months, but extensions may be negotiated if approvals or market conditions delay completion.
Q10: Can the agreement be registered at the Land Registry?
Yes. Registration under the Land Instruments Registration Law of Lagos State is crucial for admissibility in court and protection against third-party claims.
Conclusion
Joint-venture developments remain the engine powering Lekki’s real-estate transformation. From luxury waterfront apartments to gated estates in Ibeju-Lekki, these collaborations fuse capital with opportunity. However, the choice of legal structure is the difference between a thriving partnership and a costly dispute.
Whether you opt for a contractual JV, SPV, or corporate partnership, ensure meticulous due diligence, professional legal drafting, and statutory compliance. Investors and landowners should always engage experienced real-estate lawyers to craft watertight agreements that secure all interests.
For expert advisory, documentation, and representation in structuring your Lekki joint-venture or any property transaction, contact:
Contact Us
📞 0806 555 3671, 08096888818, 08024200080📧 chamanlawfirm@gmail.com📍 Chaman Law Firm 115, Obafemi Awolowo Way Allen Junction, Beside Lagos Airport Hotel, Ikeja, Lagos🌐 www.chamanlawfirm.com👉 Book a consultation now: www.chamanlawfirm.com/book-consultationProtect your investment. Partner right. Build with confidence.


